Gold Heap Leaching Plant Solution
Dasen offers China custom gold heap leaching plant solution
- Simple process
- Easy to operate
- Low energy consumption
- Low cost and good effect.
- The scale can be selected, and the maximum scale is million tons / day.
Heap leaching gold extraction does not have high requirements for topographic conditions. Permanent dump storage yards or superimposed storage yards can be set according to local conditions and topographic characteristics. If the mountain top and hillside are gentle and open, it should be used to build a permanent dump yard.
From a technical perspective, the recovery rate of the heap leaching process is lower than that of cyanidation carbon leaching and pit leaching. The requirements for ore particle size in this process are relatively broad, as long as the particle size is less than 50mm.
Particle size:
Technology process:
The heap leaching process composes of concrete of the site, pre-processing of the ore (crush or produce ), concrete heap, spray leaching, disinfecting and discharge of the recovery of gold from pregnant solution.
Raw ore treatment:
After crushing to a certain particle size (30-50mm) by jaw crusher and cone crusher, it will be directly dumped; Or carry out granulation treatment (agglomerate the finer particles into coarse powder particles), and then transport the ore to the ore pile by forklift for stacking.
Heap leaching system:
The heap leaching system shall be set on the laid ore heap. After the cyanide solution reacts with the ore heap, the gold-containing solution (precious liquid) seeps from the bottom of the ore heap and flows into the precious liquid pool. It is pumped into the adsorption column by the precious liquid pump. The solution adsorbed by activated carbon is lean liquid, which is returned to the spray system for reuse.
Gold extraction from precious liquid:
High efficiency and low consumption quick desorption electrolysis system or zinc powder replacement device is used to extract gold from your liquid, and the product is obtained after smelting.
Main Machine:Jaw crusher ,Cone crusher,Spray device, Desorption, Electric separation,Smelting furnace.
The gold ore heap leaching process is often used to develop gold ore with small ore body or low grade, or both, but cannot be developed and utilized by conventional methods.