【Project Time】16th, March 2023
【Raw ore】Rock Gold
【Capacity】600TPD
【Process 】Grinding & Flotation
【Country】Indonesia
Project Scope and Expansion
Phase 1 included a 300 TPD grinding and flotation system. Phase 2 followed the same design to add another 300 TPD.
The upgrade focused on grinding fineness and flotation performance. These were improvement objectives; no measured recovery increase or operating cost reduction is stated here.
Gold Ore Processing Flow
1. Crushing and Screening
The crushing section was specified for feed up to 350 mm. Two-stage crushing and screening reduced the ore to below 12 mm before grinding.
2. Grinding and Classification
The specified grinding equipment included a wet grate-discharge ball mill and a wet overflow ball mill, with hydrocyclone classification and slurry pumps.
The listed fineness targets were:
- Primary grinding: 65% passing 200 mesh.
- Secondary grinding: 95% passing 325 mesh.
3. Gold Flotation
The gold flotation circuit comprised one roughing stage, three scavenging stages and four cleaning stages. Flotation concentrate was sent for dewatering, while flotation tailings were directed to the tailings handling system.
4. Tailings and Water Handling
The project description included filter-press dewatering and process-water treatment for reuse. Detailed downstream gold recovery and water-treatment specifications are not included in this summary.
Equipment Manufacturing and EPC Support
Dasen Mining is a mineral processing equipment manufacturer offering ore testing, process design, equipment supply, installation and commissioning support.
For new plants and upgrades, our engineers use laboratory test results to develop processing proposals. Our mineral processing EPC services cover engineering, procurement and construction, with the scope agreed for each project.
Planning a gold plant upgrade? Send your ore assay, existing flowsheet and target capacity to discuss testing and equipment requirements with our team.
Whatsapp:+86 133 1927 7356
Email:[email protected]