What Are the Key Investment Parts in Gold Heap Leaching of Zimbabwe Project?

DASEN MACHINERY engineer went to Zimbabwe for a gold mining cyanide heap leaching project. After the Chinese Lunar New Year, our engineer Gavin was invited to Zimbabwe to set up a heap leach mine. Gold mining cyanide heap leaching is a highly cost-effective oxide gold separation method in our company’s arsenal.
gold mining cyanide heap leaching1 - What Are the Key Investment Parts in Gold Heap Leaching of Zimbabwe Project?
At our client’s gold mine site, the gold ore grade ranges from 0.71 – 2 grams per ton and is of the oxide type. As the client requested a high-performance-cost ratio, low – investment, quick-gain, and low-risk solution, we’ve crafted a concise flow sheet for the project.
heap leach mine - What Are the Key Investment Parts in Gold Heap Leaching of Zimbabwe Project?
For a successful heap leach mine operation, the investment mainly covers the following aspects:
Mining part: This includes blasting materials and heavy machinery such as excavators, bulldozers, and dumping trucks.
Crushing equipment: Jaw crushers and hammer crushers are essential for reducing the ore size.
Heap leaching materials: Geomembrane (waterproof material), connection pipes, water pipes, valves, pumps, and activated carbon tanks are crucial components.
Chemicals: Sodium cyanide and activated carbon play vital roles in the gold mining cyanide heap leaching process.
Smelting materials: These are necessary for the final stage of extracting pure gold.
gold heap leaching process - What Are the Key Investment Parts in Gold Heap Leaching of Zimbabwe Project?
If you’re interested in gold mining cyanide heap leaching or want to know more about our services, don’t hesitate to contact us. DASEN MINING, with a 30-plus-year-old factory and a complete mineral separation processing supply chain, warmly welcomes you to visit our factory and explore the potential of cooperation.

Whatsapp:+86 133 1927 7356
Email:[email protected]