Why Choose Small Gold Leaching Plant for 3ppm Ore in Geita, Tanzania?

Gold Leaching Plant for Rock Gold Ore: Project Overview

The below pic is gold ore material in Geita area of TZ.

gold leaching equipment - Why Choose Small Gold Leaching Plant for 3ppm Ore in Geita, Tanzania?

We have inspected the customer’s raw gold ore, which shows minor oxidation and contains minimal sulfides. This makes the ore suitable for gold leaching.

At the customer’s site, the current process involves simple crushing equipment followed by Amalgamation recovery of granular gold. However, this method is inefficient and results in gold loss. The customer wishes to upgrade to a more effective production line.

Customer’sOre Analysis:

leaching gold - Why Choose Small Gold Leaching Plant for 3ppm Ore in Geita, Tanzania?

The average gold content is approximately 3 ppm, as confirmed by the customer. This is suitable for a container-type gold leaching plant.

The customer is based in India and owns a gold mine in the Geita area of Tanzania. They have already obtained the necessary mining certificate and plan to visit Tanzania in mid-April. As a newcomer to gold leaching, the customer is interested in starting with a container-type mobile gold leaching plant, which is ideal for small-scale operations.

About the Container-Type small Gold Leaching Plant

Additionally, our manager will visit Tanzania next month. Our team will be based in Dar es Salaam. If you are interested in meeting with our team, please let us know. Geita, Tanzania, is known for its rich gold ore resources, and we would be happy to discuss long-term cooperation.

If you are interested in our gold leaching plant, feel free to contact us.

Dasen Mining Machinery has over 30 years of experience in gold ore recovery, with numerous successful overseas projects. We look forward to your inquiry.

Whatsapp:+86 133 1927 7356
Email:[email protected]