What Does Our Technician Do When A 10TPD Gold CIL Plant Arrive At The Mine Site?
We have shipped a container-type gold CIL plant to Lebanon, after the arrival, we dispatched our technician to operate the plant.
Then how does our technician work at the site?
This set of cyanidation equipment is installed in containers. All the machines are installed well before shipment. Our technician only makes the connections after arrival at the site, then starts the trial operation and trains the on-site workers.
The technician explains in detail the operation, operation principle and precautions of each equipment. Regarding leaching, the staff are taught how to test the fineness of the material, test the reagent, test of the alkalinity, how often to test, and how to keep records every time. The working of the crushing part and grinding part is working about 10 hours per day and the leaching part is working 24 hours. During the final smelting part, our technician also shows every step to teach the people at the site, and we make it into text form for their records.
Whatsapp:+86 133 1927 7356
Email:[email protected]