Heap leaching. What are the requirements for pipeline layout? Generally, what is used as a reference for the number of pipelines as the heap size increases? What is the basis for the layout?
The height of the ore heap in heap leaching should be determined based on the characteristics of the ore, which can vary significantly. The slope should be managed accordingly. It is preferable to choose a flat terrain for the heap.