Dasen Mining’s Nigeria Tantalum Tin Mine Project-EPC

Project Overview
The Dasen Mining Company’s newly established tantalum tin mine project in Nigeria is steadily progressing, encompassing a full range of Engineering, Procurement, and Construction (EPC) services, from exploration, sampling, site selection and construction, to the equipment commissioning.

Mine Area Highlights
Located in the grassland region of Nigeria
Convenient access to water sources, facilitating ore washing
Surrounding areas are cultivated for vegetable and fruit farming, facilitating the miners’ livelihood

Hilary, our person in charge this time, sent us this video of the mining area:

Tin Ore Dressing Process
Based on the characteristics and composition of tantalum tin ore, a 100tph tin ore dressing flowchart has been developed, incorporating equipment such as vibrating feeders, drum scrubbers, vibrating screens, jig machines, shaking tables, and three-disc magnetic separators.

Hourly production capacity: 100 tons
Dassen Advantages
Extensive experience in mining projects
Specialized technical team
One-stop EPC services
Efficient project execution capability
Dasen Mining is committed to providing clients with comprehensive solutions for mining projects, assisting them in achieving efficient development and utilization of mining resources.

Further Details of the Nigeria Tantalum Tin Mine Project
Exploration Phase: Dasen Mining’s experienced exploration team conducted detailed surveys of the area, ultimately determining the location and scale of the ore deposit.
Sampling Phase: Dasen Mining collected a large number of ore samples, conducted analytical testing, and determined the grade and composition of the ore.
Site Selection and Construction Phase: Dasen Mining selected suitable mining site locations and constructed infrastructure including roads, workshops, and water and electricity facilities.
Equipment Commissioning Phase: Dasen Mining transported Customized ore dressing equipment to the mine area and underwent installation and commissioning.
Commissioning Phase: Dassen Mining engineers conducted equipment commissioning to ensure its normal operation.
Dasen Mining looks forward to collaborating with more clients, providing them with high-quality mining project services.

Whatsapp:+86 133 1927 7356
Email:[email protected]


    Input this code: 2705279534 - Dasen Mining's Nigeria Tantalum Tin Mine Project-EPC