Chrome Ore Processing Flow (Crusher → Jig → Shaking Table)
The following gravity-based flow sheet is an ideal entry-level solution for chrome-ore beneficiation projects:
Primary & secondary crushing
• Target product size: 3–5 mm
Rough concentration – Jig machine
Final concentration – Shaking table
Why choose this flow?
• No grinding mill required – eliminating both capital expense and power consumption associated with ball milling.
• Simple installation – three core machines, minimal civil works.
• High recovery on 3–5 mm feed – jigs deliver a quick rough upgrade; shaking tables finish the concentrate.
• Lower CAPEX – perfect for first-time chrome processors or pilot plants.
After the two crushing stages the material already meets the optimal size range for jigging. The combined jig + table circuit maximises chrome recovery while keeping operating costs low.
Need a customized flow sheet, equipment sizing or a budget quotation?
Whatsapp:+86 133 1927 7356
Email:[email protected]