Tanzania 1 Tonne per Hour Rock Gold Plant

【Project Date】 March 20, 2022
【Raw Ore】 Rock Gold Ore
【Capacity】 1 Tonne per Hour (TPH)
【Process】 Gravity Separation and Gold Leaching plant
【Recovery Rate】 70%
【Country】 Tanzania
【Equipment】Jaw Crusher,Wet Pan Mill, Mercury Plates

Recently, we shipped machinery to Tanzania for processing gold ore. The client’s gold ore had a high grade and was oxidized. Given the high grade, averaging 15g/t, with free and visible gold, we determined, after analyzing the client’s ore, to prioritize recovering the visible gold. The free gold would be present in the tailings, for subsequent cyanide processing.

Therefore, we recommended crushing and grinding equipment to the client: a jaw crusher, wet pan mill, and mercury plates as a starting point, with plans to heap leach the tailings after accumulating a sufficient quantity.

mining heap leach pad - 1 Ton Per Hour Rock Gold Plant in Tanzania

Our engineers traveled to Tanzania to install the machinery and operate the plant for a period, training the client’s technicians. Using the mercury plates, we recovered the visible gold and smelted it. For the next stage, we plan to heap leach the tailings. We have experience with water mill clusters in West Africa, Nigeria, where we used 10 wet pan mills to process 10 tonnes of gold raw ore per hour, and achieved a combined recovery rate of over 95% with 2,000-tonne batches of tailings for heap leaching.

Tanzania possesses excellent gold ore reserves. During our engineers’ time stationed there, we also researched the gold market and learned about the local gold ore characteristics. This will help us recommend appropriate processing methods to clients.

In addition to gravity separation for gold ore, Our Company is skilled in cyanide leaching and flotation methods, and we provide clients with customized solutions for these materials.