【Project Time】23th,Feb. 2024
【Country】Zimbabwe
【Capacity】100000 tons per day
【Process】Gold heap leaching plant
【Raw ore】Oxide Ore
In 2024, Dasen Mining undertook a large-scale heap leaching project in Zimbabwe, targeting a deposit of oxidized gold ore previously deemed uneconomical due to its low grade of 1.3 g/t. Leveraging 10 years of international experience, Dasen provided a turnkey technical service (EPC)package from feasibility to production.
- Technical Highlights
Ore Grade: 1.3 g/t
Recovery Rate: 65%
Leaching Method: Heap Leaching
Construction Period: 40 days
Production Duration: 180 days - Economic Outcomes
Total Cost: $1,500,000
Gold Recovered: 84,500 g
Revenue: $7,605,000 (at $90/g)
Gross Profit: $6,105,000
Profit Margin: 80.3%
Dasen Mining Advantages
Rapid Payback: Cash flow began within 40 days
High Yield from Low Grade: Proved feasibility of 65% recovery
Full System Integration: Dasen supplied all materials, carbon, reagents, power, and water solutions
Risk Mitigation: Feasibility testing and on-site pilot ensured predictable ROI.
Client Testimonial
“Dasen’s team delivered not just a heap leaching plant, but a profit engine. We achieved breakeven in under two months.”
— Project Director, Zimbabwe Operations
Whatsapp:+86 133 1927 7356