【Project Time】16th, March 2023
【Raw ore】Rock Gold
【Capacity】600TPD
【Process 】CIP & Flotation
【Country】Indonesia
The Indonesia 600tpd gold mine project is a CIP (Carbon-in-Pulp) beneficiation plant renovation undertaken by Dasen Mining. The focus was on optimizing the grinding and flotation sections to improve efficiency and recovery rates.
The plant was designed in two phases:
- Phase 1 (300tpd): Initial grinding and flotation system.
- Phase 2 (300tpd): Expansion to 600tpd, mirroring Phase 1’s design.
Process Flow
1. Crushing & Screening
Feed size: ≤350mm
Process: Two-stage semi-closed circuit crushing
Final product: -12mm (optimized for grinding efficiency)
2. Grinding & Classification
Primary grinding: Wet grid ball mill → -200 mesh (65%)
Secondary grinding: Wet overflow ball mill → -325 mesh (95%)
Classification: Hydrocyclone + pump system
3. Pre-selection & Flotation
Flotation circuit: 1 roughing, 3 scavenging, 4 cleaning
Products:
Flotation concentrate (sent to dewatering)
Flotation tailings (pumped to tailings system)
4. CIP Gold Extraction
Oxidation pretreatment: 60h in dual-impeller leaching tanks → filter press dewatering
Cyanide leaching: 48h → 2-stage leaching, 3-stage washing
Gold recovery: Zinc powder displacement for gold mud
5. Tailings & Wastewater Treatment
Tailings dewatering: Box filter press → dry stacking in tailings pond
Wastewater treatment: Two-stage purification (neutralization + filtration) → recycled for pre-oxidation
DasenMining Advantages:
✔ Modular expansion (300tpd → 600tpd)
✔ Optimized grinding for higher liberation
✔ Efficient flotation & CIP for maximum gold recovery
✔ Dry tailings disposal – eco-friendly & cost-effective
This 600tpd Gold Mine CIP & Flotation Plant Project demonstrates Dasen Mining’s expertise in gold processing plant upgrades, ensuring higher recovery, lower costs, and sustainable operations.
Whatsapp:+86 133 1927 7356
Email:[email protected]