250 kg Gold Desorption and Electrowinning Unit for CIP/CIL Plants

250 kg Gold Desorption and Electrowinning Unit

Dasen Mining’s 250 kg unit recovers gold from gold-loaded activated carbon through desorption and electrowinning. As a desorption electrolysis system , it is intended for the loaded-carbon recovery stage within a gold CIP/CIL processing plant, rather than for direct treatment of raw gold ore: gold is first stripped into solution and then recovered by electrowinning.

Equipment and Supply Scope

The equipment listed for this unit includes:

  • Carbon loading hopper
  • Desorption column
  • Rectifier cabinet
  • Electrowinning cell
  • Desorption solution tank
  • Circulation pump
  • Control cabinet 

The package also includes a carbon steel support frame, process piping, valves, flanges, fasteners and gaskets; cell ventilation ducting and a fan; instruments, control cables and power cables. Commissioning spares and spares for three months of operation are listed, subject to the agreed supply schedule.

Operating Conditions and Installation

The supplied specification lists an operating temperature of 95–98°C. The final technical datasheet should identify the temperature requirements for each process stage, the heating arrangement and the pressure reference.

Factory assembly and checks do not replace site commissioning. Before startup, confirm utility connections, ventilation, operating procedures and site readiness with the project engineer.

dasen 250kg gold desorption electrowinning unit - 250 kg Gold Desorption and Electrowinning Unit for CIP/CIL Plants

gold desorption column electrowinning cell - 250 kg Gold Desorption and Electrowinning Unit for CIP/CIL Plants

Questions Before Ordering

Is gold melting equipment included?

The current equipment list does not identify a melting furnace. Confirm any downstream smelting equipment separately in the quotation.

What information is needed to select the unit?

Provide the carbon quantity per batch, gold loading, required processing schedule and available utilities. These details allow our engineers to assess whether the unit suits your plant.

Engineering and EPC Support

Dasen combines equipment manufacturing with professional engineering and laboratory testing support. For wider projects, our mineral processing EPC services cover process design, equipment supply, installation and commissioning.

Planning a gold CIP plant project or upgrading an existing carbon recovery circuit? Send your carbon specifications and project requirements to Dasen for a technical review and quotation.

Whatsapp:+86 133 1927 7356
Email:[email protected]