200TPD Gold Ore CIP Plant Launched in Tanzania
Following nearly six months of on-site research and project preparation, DASENMINING, in partnership with an international collaborator, has successfully commissioned a newly built 200 tonnes-per-day (TPD) gold processing plant utilizing the Carbon-in-Pulp (CIP) leaching technology.
During the early project phase, the DASEN team held meetings with hundreds of local miners to conduct in-depth studies on ore distribution, mining conditions, and processing potential.

On-Site Progress & Equipment Delivery
As of March 24, 2026, all critical mining supplies and equipment have been delivered to the project site, including:
- Winches and crane lifting equipment
- Generator sets
- Air compressors
- Loaders and auxiliary machinery
In the next phase, DasenMining will establish an on-site testing laboratory for detailed ore analysis and process validation, laying the groundwork for full-scale production.
Technical Support & EPC Services
DASENMINING brings together a professional team with extensive expertise in mechanical design, mineral processing engineering, equipment installation and commissioning.
Our engineering team provides full EPC/turnkey solutions covering:
- Ore testing and mineral processing experiments
- Process design and flow sheet configuration
- Equipment manufacturing and supply
- On-site construction, installation and commissioning
- Operator training and ongoing technical support
With proven project experience across Africa, Asia and South America, DasenMining remains committed to helping clients achieve efficient, safe and sustainable gold production.